Browse all practice questions for the Professional Scrum Master (PSM) III Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Professional Scrum Master (PSM) III Practice Test course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • During which session do teams self-reflect on the past Sprint?
  • Which of the following statements is FALSE regarding the conditions that foster creativity and quality during a Sprint?
  • When is a system's architecture typically decided?
  • What role does the Sprint Goal play in a Sprint?
  • What should be rejected with regard to Sprint 0?
  • Which of the following are NOT appropriate topics for discussion in a Sprint Retrospective? (Choose two)
  • When should testers and quality experts be included in a project for optimal results?
  • Why does a Development Team need a Sprint Goal?
  • What does the definition of "Done" help to establish?
  • What is the primary purpose of a Sprint in Scrum?
  • What is the primary tool for the Product Owner to ensure transparency in Scrum?
  • When is the Sprint Backlog created?
  • What action should the Product Owner take when priorities in the Product Backlog change?
  • What best describes the role of a Product Owner?
  • Who is primarily responsible for managing the progress of work during a Sprint?
  • Who must attend the Daily Scrum meeting?
  • What does it mean for a bug report to contain "one bug per report"?
  • How much of the Sprint Backlog must be defined during the Sprint Planning meeting?
  • How does system decomposition affect Scrum Teams on scaled projects?
  • What does Code Coverage show?
  • Are cross-functional teams in Scrum allowed to work on only one technical layer of a system?
  • Which item is NOT included in the Scrum framework?
  • How is ownership of a Sprint Backlog Item viewed within the Development Team?
  • Which of the following is NOT a benefit of self-organization?
  • What is the importance of the Daily Scrum for the Development Team?
  • What is the purpose of the Definition of Done in Scrum?
  • Which of the following is a good practice regarding security concerns in a Scrum Team?
  • In a scenario with multiple Scrum Teams building one product, what is a crucial condition to maintain?
  • What is a key responsibility of the Product Owner?
  • Which of the following are feedback loops in Scrum?
  • Who's required to attend the Daily Scrum?
  • What is the maximum length a Sprint can be?
  • How should the Product Owner and Development Team interact during a project?
  • Which aspect is critical for maintaining transparency in a Scrum project?
  • What two phrases best describe the relationship of the Product Owner and the Development Team?
  • Which role is primarily responsible for maximally delivering value in Scrum?
  • Which two methods of creating Development Teams align with Scrum's values?
  • Which approach helps a Scrum Team address security concerns?
  • During a Sprint, how should the Development Team respond to changes?
  • As the Sprint Planning meeting progresses, what valid actions can the Development Team take when the workload exceeds their capacity?
  • What distinguishes the Product Owner's role in conveying progress towards business objectives?
  • What does a successful Daily Scrum typically foster among the Development Team?
  • How should a Development Team handle non-functional requirements?
  • Why is it important for the Development Team to make decisions collectively?
  • Who determines when it is appropriate to update the Sprint Backlog during a Sprint?
  • What does code coverage measure?
  • Can a Product Owner postpone the start of a new Sprint after the conclusion of a previous Sprint?
  • What does Scrum require from the Increment produced at the end of a Sprint?
  • How does system decomposition influence Scrum Teams on scaled projects?
  • What does it mean for a Development Team to own a Sprint Backlog item?
  • What is the likely immediate impact on the productivity of the original Scrum Team when two additional teams are added to product development?
  • What is an ideal measure of a person's workday within a Scrum Team?
  • Who takes ownership of a Sprint Backlog Item in a Scrum team?
  • How does the Product Owner assist the Development Team?
  • What is the reason a Product Owner can postpone the start of a new Sprint after the conclusion of a previous Sprint?
  • What impact does poor technical choices have according to the concept of Technical Debt?
  • What characteristic of a Scrum Master supports the Development Team's productivity?
  • What aspect of Scrum focuses on the presence of a Scrum Master during the Sprint?
  • Why is it important for the Development Team to have guiding architecture principles?
  • What are two appropriate actions for a Scrum Master if the Development Team lacks necessary tools?
  • What is the primary responsibility of the entire Development Team regarding quality?
  • Who determines how many Product Backlog items the Development Team selects for a Sprint?
  • Who is responsible for tracking the remaining work of the Sprint?
  • What is the primary purpose of a Sprint?
  • Who owns the Sprint Backlog?
  • What is the role of the Product Owner during the Sprint Review?
  • Is it mandatory to release a product increment to production at the end of each Sprint?
  • What does the term 'Done' signify in Scrum?
  • Which of the following describes an effective Development Team?
  • What is the purpose of defining "Done" in Scrum?
  • Which of the following describes the characteristics of good Product Backlog Items?
  • What role does the Scrum Master play in conflict resolution?
  • When does a new Sprint start in the Scrum framework?
  • What is the maximum length of a Sprint?
  • What is one of the roles of Management in Scrum?
  • Which of the following is a responsibility of a self-organizing Development Team?
  • What is pair programming?
  • What does Code Coverage indicate?
  • What action should a Scrum Master take if the Product Owner is not collaborating with the Development Team?
  • What is one reason to automate the software build process?
  • What may a Development Team deliver at the end of a Sprint?
  • What are two typical activities for a Product Owner during a Sprint?
  • What is the main purpose of a Daily Scrum?
  • If the Scrum Master sees the Product Owner struggling, what is an appropriate action to take?
  • Is it true that every Scrum Team must have both a Product Owner and a Scrum Master?
  • Which benefit of Continuous Integration helps team members to collaborate more effectively?
  • In Scrum, what does the Scrum Master do during a Sprint?
  • Which of the following is NOT a benefit of self-organization?
  • What is the primary focus of the Development Team during a Sprint?
  • What best describes a Product Owner's primary responsibility?
  • What outcome is expected as Scrum Teams mature?
  • Who must be present at the Daily Scrum meeting?
  • Must all Development Team members attend the Nexus Daily Scrum?
  • The Product Owner is responsible for ensuring that enough items are selected from the Product Backlog for the Sprint to satisfy stakeholders?
  • Which aspect is NOT primarily the responsibility of the Development Team?
  • If a Scrum Master has a growing list of open impediments, which technique is most helpful?
  • Who is responsible for managing the process within the Scrum Team?
  • Which attribute is NOT associated with a bad bug report?
  • Why is the Daily Scrum held at the same time and place each day?
  • Which statement is true about the Scrum Team's roles?
  • How much of the Sprint Backlog must be defined during the Sprint Planning meeting?
  • Which statement reflects the essence of incremental delivery in Scrum?
  • Is a Product Owner the same as a traditional Project Manager?
  • When should a Sprint Goal be created in the Scrum framework?
  • Who should be present during Product Backlog refinement?
  • Sprint burndown charts are effective because they show:
  • Why is the definition of "Done" important for the Product Owner?
  • What is the relationship between Scrum and technical practices?
  • What is a primary responsibility of the Development Team in Scrum?
  • What role does the Scrum Master play in relation to the Development Team?
  • To what aspect does the term "increment" refer in a Scrum context?
  • What is the main reason for the Scrum Master to be at the Daily Scrum?
  • What is expected from the Development Team regarding communication with the Product Owner?
  • Which of the following are active roles on a Scrum Team?
  • What is a significant advantage of Test Driven Development?
  • What is the primary goal of test first development?
  • What is a key condition that fosters productivity during the Sprint?
  • One of the shortcomings of code coverage is its potential to create what kind of incentive?
  • What does the term "Sprint 0" refer to in Scrum?
  • What is a key aspect of the Scrum framework regarding teamwork?
  • What is the role of management in Scrum?
  • Which of the following is an attribute of a good bug report?
  • How can a Development Team ensure a good application architecture?
  • Does Scrum include a role specifically called "project manager"?
  • What is a key benefit of the Sprint Retrospective?
  • The Product Owner must monitor and share progress of the Product Backlog through which method?
  • What is the main reason for the Scrum Master to be at the Daily Scrum?
  • What is the primary purpose of the first part of the Nexus Sprint Retrospective?
  • When should a Sprint Retrospective be held?
  • What does the term "Increment" refer to in Scrum?
  • What outcome is expected from establishing a clear definition of "Done"?
  • What aspect of the Sprint Backlog allows it to be adaptable?
  • Which of the following is NOT a way the Development Team can ensure a good application architecture?
  • Must the Product Owner be present at the Sprint Retrospective?
  • What is described as pair programming?
  • What is the primary responsibility of the Product Owner in Scrum?
  • What is the expected output of a Sprint in Scrum?
  • During the Sprint, what are two primary roles of the Scrum Master?
  • Who should be present during Product Backlog refinement?
  • Why does a Development Team need a Sprint Goal?
  • On what principle is Scrum's process control based?
  • Which statement best describes a Product Owner's responsibility?
  • What is the least productive technique for the Scrum Master to encourage communication between the Development Team and the Product Owner?
  • What does it mean when an event is described as time-boxed in Scrum?
  • How often should the build be executed in a Scrum project?
  • What is the correct statement about Product Backlogs when multiple teams are involved?
  • When should a Sprint Retrospective be held?
  • Which description best fits the role of the Product Owner?
  • What is included in the Sprint Backlog?
  • Which of the following is a benefit of Continuous Integration?
  • Why might a Scrum Master need to ensure that the Daily Scrum stays within a time-box?
  • What is the primary purpose of the first part of the Nexus Sprint Retrospective?
  • How should a group of 100 people be divided into multiple Development Teams?
  • When can a Product Backlog item be considered complete?
  • What might the Scrum Team discuss during a Sprint Retrospective?
  • Which statement is false regarding the Sprint Backlog?
  • What is the role of management in Scrum?
  • What is a false statement regarding conditions for fostering creativity and productivity during a Sprint?
  • How is the Product Backlog best described?
  • Is a Nexus Integration Team responsible for actually doing the integration work during the Sprint?
  • Are cross-functional teams in Scrum optimized to work on a single technical layer only?
  • Which statement best describes an increment of working software?
  • Is a Scrum Team allowed to meet with stakeholders outside of Sprint Review?
  • What activity will a Product Owner engage in during a Sprint?
  • How much time is required after a Sprint to prepare for the next Sprint?
  • In Scrum, should multiple teams working on the same product maintain separate Product Backlogs?
  • What is the maximum duration of a Sprint according to Scrum guidelines?
  • What effect does releasing an Increment have on validated learning?
  • How should the development team handle the Sprint Backlog during a Sprint?
  • Who is responsible for tracking the remaining work during a Sprint?
  • Is a Product Owner essentially the same as a traditional Project Manager?
  • When assessing the effectiveness of a Sprint, what should be evaluated?
  • What is the main focus of the Development Team during a Sprint?
  • What is one benefit of establishing naming standards for code?
  • What is the correct number of Product Backlogs when multiple teams are working on the same product?
  • Which answer best describes the topics covered in the Sprint Planning Meeting?
  • In order to keep the business risk acceptable, how should a Sprint be structured?
  • Who is ultimately responsible for estimating Product Backlog items?
  • What does each component of Scrum serve?
  • What is meant by the term "Increment" in Scrum?
  • When might a Sprint be terminated before its planned end?
  • What does Code Coverage indicate?
  • What is a key aspect of the Sprint Review in Scrum?
  • What is the fixed time-box for a Daily Scrum?
  • What is the primary responsibility of a Development Team?
  • What should happen if the Development Team faces obstacles in achieving the Sprint Goal?
  • What is the primary focus of a Sprint according to Scrum guidelines?
  • Who is essential to be present during Product Backlog refinement?
  • Which aspect is essential for Scrum Teams during their development process?
  • What is the time-box for the Sprint Planning meeting in Scrum?
  • When can the Development Team participate in Product Backlog refinement?
  • Who is responsible for ensuring all Development Team members perform their tasks during a Sprint?
  • How can a Product Owner leverage time-boxed Sprints to gather user feedback?
  • Who is responsible for creating the definition of "Done" in Scrum?
  • What is a key characteristic of Scrum as a framework?
  • Which statement best describes a Product Owner's responsibility?
  • When should a Sprint Goal be established?
  • Which two practices help ensure good application architecture within a Development Team?
  • What action should a Development Team take when they don't understand a functional requirement?
  • Which statement best describes the role of the Scrum Master in estimating work?
  • Can a first Sprint commence before a complete Product Backlog is created?
  • What should always guide the Product Owner when ordering the Product Backlog?
  • Which of the following is NOT a metric of code quality?
  • Which of the following are roles within a Scrum Team?
  • What is a release burndown?
  • What does a test written with Test Driven Development signify?
  • During a Sprint Retrospective, which aspect might the Scrum Team discuss?
  • What are the timeboxed events in Scrum?
  • Which of the following is NOT considered Test-Driven Development?
  • What is a key outcome of a successful Sprint Review?
  • What is one way to ensure security concerns are satisfied in a Scrum Team?
  • What is one benefit of self-organization within a Scrum Team?
  • What is a key way for a Product Owner to apply validated learning?
  • What should the Development Team do if the Product Owner is unavailable during a Sprint?
  • How should a group of 100 people be divided into multiple Development Teams according to Scrum theory?
  • What does a test written with Test Driven Development represent?
  • Why is stakeholder involvement important in the Sprint Review?
  • What is a primary limitation of code coverage as a testing measurement?
  • What does a time-boxed event imply in Scrum?
  • Is Scrum considered a methodology that explains how to build software incrementally?
  • Which of the following consequences may arise if the definition of done is inconsistent?
  • When should new work or further decomposition of work be added to the Sprint backlog?
  • How much of the Sprint Backlog must be defined during the Sprint Planning meeting?
  • How does an organization know that a product built through Scrum is successful?
  • What is the maximum time-box duration for a Sprint Planning meeting for a one-month Sprint?
  • What is the immediate impact on the productivity of the original Scrum Team when two additional Scrum Teams are added to the development of a product?
  • What is a key benefit of establishing a Definition of Done?
  • How much work must a Development Team complete on a selected Product Backlog item during a Sprint?
  • How should a Development Team handle non-functional requirements?
  • What should a Scrum Master do if the Development Team lacks necessary engineering tools and infrastructure?
  • How is the Sprint Goal typically defined?
  • Which statement is true about Scrum and traditional project management?
  • What happens if backlog items are not completed within a Sprint?
  • Why is the definition of "Done" important to the Product Owner?
  • How does self-organization typically affect team dynamics?
  • What action should be taken if the Product Owner is unavailable?
  • Is Scrum a methodology that specifies how to build software incrementally?
  • In Scrum, who is accountable for the success of the product?
  • What should a Scrum Team analyze during the Sprint Retrospective?
  • What is the primary role of the Scrum Master during the Daily Scrum?
  • When encountering a bug in previously delivered functionality, what action should be taken?
  • How does a Scrum Team ensure continuous delivery of value?
  • What is a common characteristic of a Sprint in Scrum?
  • Which of the following is NOT a Scrum practice that supports team collaboration?
  • What does it mean for a Development Team to be cross-functional?
  • When does the next Sprint begin?
  • In Scrum, how does the Development Team select items from the Product Backlog?
  • What does the Sprint Burndown chart illustrate during the Sprint?
  • What is the role of Management in a Scrum environment?
  • What is a key responsibility of the Scrum Team as a whole?
  • Which document serves as a living artifact of product requirements?
  • What can happen if individual ownership of Sprint Backlog items is allowed?
  • What is a unit test?
  • What is an expected outcome of effective technical practices in Scrum?
  • Which team is responsible for ensuring that the Product Backlog items meet the Definition of "Done"?
  • What is essential for a good bug report regarding reproduction steps?
  • What is the main purpose of holding a Sprint Retrospective?
  • What is one outcome of a successful Sprint Retrospective?
  • Is it mandatory for all Development Team members to attend the Nexus Daily Scrum?
  • When enhancing an existing product, which documentation is least useful?
  • What is a valuable action for a Scrum Master when the Product Owner remains distant during the Sprint?
  • In Scrum, what is the outcome of Sprint Review?
  • What activities can a Product Owner undertake between the end of the current Sprint and the start of the next?
  • Which practice can enhance teamwork during Sprints?
  • What best describes the Sprint Backlog?
  • What is a significant benefit of self-organization within Scrum teams?
  • Why is a focused Development Team often more productive?
  • What implicit role does a Product Owner facilitate during the Sprint?
  • Is the Product Owner responsible for determining how many Product Backlog items the Development Team selects for a Sprint?
  • What does it mean for an event to have a time-box in Scrum?
  • What is the purpose of the Nexus Integration Team?
  • Is it true that stakeholder feedback is only considered during the Sprint Review?
  • What is a critical component of the Scrum framework during a Sprint?
  • Is the Scrum Master considered a management position?
  • What is one of the primary ways a Scrum Master enhances a Development Team's productivity?
  • What are some shortcomings of code coverage as a measurement for how well a system or product is tested? (choose 3 answers)
  • Is the Scrum Master considered a management position?
  • Why is the Daily Scrum held at the same time and place every day?
  • Who is responsible for ensuring that each team member completes their tasks during the Sprint?
  • What should remain intact during a Sprint?
  • If the Development Team lacks necessary tools and infrastructure, what should the Scrum Master do?
  • Who has the authority to abnormally terminate a Sprint?
  • What should the Development Team do if they encounter a problem outside of their control during a Sprint?
  • What is NOT a benefit of self-organization in Scrum?
  • What should a Development Team do when they struggle to deliver a work increment?
  • What is the time requirement after a Sprint to prepare for the next Sprint?
  • Why is the definition of "Done" important to the Product Owner?
  • How does system decomposition affect Scrum Teams on scaled projects?
  • What role does a Scrum Master primarily play in a Scrum Team?
  • What is a common reason for documenting impediments?
  • Which statement is true regarding large-scale software development with Scrum?
  • What should the Development Team do if requirements change unexpectedly during a Sprint?
  • What role does a Product Owner play in ensuring stakeholder needs are met?
  • What is the key focus of a Sprint Planning meeting?
  • How often does the Product Owner interact with the stakeholders?
  • What are some benefits of Test Driven Development?
  • How much work must a Development Team do to a Product Backlog item it selects for a Sprint?
  • In Scrum, who is accountable for ensuring maximized value from the development effort?
  • What does an architecture spike refer to in a Scrum context?
  • What is the definition of "Done" in Scrum?
  • What best describes the Sprint Backlog as an outcome of Sprint Planning?
  • What does the Scrum Master primarily serve as for the Development Team?
  • If the Development Team lacks the necessary tools to complete Product Backlog items, what should the Scrum Master do?
  • What typically happens to team cohesion when Development Team membership changes?
  • Which statement about the Sprint Backlog is FALSE?
  • What variables should a Product Owner consider when ordering the Product Backlog?
  • Which of the following is a responsibility of a self-organizing Development Team?
  • What guideline should a Scrum Master provide regarding work estimation in Scrum?
  • What is an essential focus of the Scrum methodology?
  • What is an appropriate action for a Scrum Master if the Product Owner struggles with ordering the Product Backlog?
  • What does Code Coverage measure in software testing?
  • What are the pre-conditions needed to initiate Sprint Planning?
  • What does the Sprint Burndown measure?
  • What is created during the Sprint Planning meeting?
  • What does the Sprint Burndown measure?
  • What are two responsibilities of a Development Team?
  • What are two responsibilities of the Product Owner in Scrum?
  • If a Product Backlog item worked on during a Sprint does not meet the definition of "Done," what should happen?
  • What is a main benefit of establishing naming standards for code?
  • What are two benefits of Test Driven Development?
  • What is the time-box for a Daily Scrum?
  • Which document outlines the work to be completed in a Sprint?
  • What responsibility does the Development Team have during a Sprint Review?
  • What are two typical activities for a Product Owner during a Sprint?
  • Can only technical writers create documentation during a Sprint?
  • How is architecture and infrastructure managed in Scrum?
  • Who is required to attend the Daily Scrum?
  • Which of the following are benefits of Test Driven Development?
  • How should vague statements or untested assumptions be viewed in a bug report?
  • What is the role of the Scrum Master during a Sprint?
  • How is successful communication fostered within a Scrum Team?
  • What is the main goal of Sprint Planning?
  • What is the main purpose of the Product Backlog?
  • When is the only time stakeholders and the Scrum Team can come together?
  • Which of the following best describes the function of the Sprint Goal?
  • What does a strong definition of "Done" contribute to a Scrum Team?
  • When does the Development Team participate in Product Backlog refinement?
  • What is essential for maintaining transparency in Scrum artifacts?
  • How should Development Team membership change?
  • What is the responsibility of the Product Owner regarding the selection from the Product Backlog?
  • Which two factors should be most considered when establishing the length of a Sprint?
  • How often should a Product Owner update the Product Backlog?
  • What should a Development Team do if they have selected too much work during a Sprint?
  • What aligns with the responsibility of a Product Owner?
  • Refactoring code can lead to which of the following improvements?
  • In a Scrum framework, who is responsible for maximizing the value of the product?
  • When might a Sprint be abnormally terminated?
  • Is a Nexus Integration Team responsible for doing the integration work during a Sprint?
  • Which statement about the Scrum Team is correct?
  • What is the recommended size for a Scrum Development Team?
  • How should the Development Team handle changes to the Product Backlog items during a Sprint?
  • What is the most effective way a Scrum Master can help maximize the Development Team's productivity?
  • Which of the following is NOT a characteristic of Scrum?
  • Which of the following roles is NOT part of a Scrum Team?
  • If the Development Team struggles to deliver a work increment, what should they do?
  • During a Scrum Sprint, what should the agreed-upon Sprint Goal primarily aim to achieve?
  • What is an important responsibility of the Product Owner during the Sprint Review?
  • Who is responsible for ensuring that all tasks are completed during a Sprint?
  • What is the purpose of the Sprint Retrospective?
  • What does a trend line in a release burndown chart indicate?
  • What is the primary focus of a Scrum team during a Sprint?
  • During a Sprint, if the Development Team cannot finish the forecasted work, who should be involved in reviewing and adjusting the Sprint work?
  • What is a limitation of using code coverage as a measurement?
  • Who primarily leads the inspection process during the Sprint Review?
  • What is the primary responsibility of the Scrum Master during the Daily Scrum?
  • Is it true that there is one Product Backlog for a Nexus?
  • What is the primary responsibility of the Product Owner in Scrum?
  • How do items on the Product Backlog compare to items in the Sprint Backlog?
  • Which three are recognized feedback loops in Scrum?
  • What are two important actions for a Scrum Master if the Product Owner is not collaborating with the Development Team during the Sprint?
  • What is one outcome of effective refactoring?
  • What should the Development Team plan for each Sprint regarding architecture?
  • Who is responsible for ensuring that team members complete their tasks during the Sprint?
  • Which characteristic is NOT vital for unit tests?
  • Is Scrum a methodology that tells in detail how to build software incrementally?
  • How does an organization know that a product built through Scrum is successful?
  • What is the role of the Product Owner in a Scrum Team?
  • What does the term 'release burndown' refer to in Scrum?
  • Which benefit is associated with Test Driven Development?
  • Which technique is the best way for the Scrum Master to ensure effective communication between the Development Team and the Product Owner?
  • Who is responsible for creating the definition of "Done"?
  • Which of the following statements about the Product Backlog is correct?
  • What is considered a good practice for a Scrum Master?
  • Which of the following conditions fosters creativity and productivity during a Sprint?
  • Which method is crucial for effective Scrum implementation regarding project timeline?
  • When is the implementation of a Product Backlog item considered complete?
  • What is one of the main responsibilities of the Scrum Master?
  • What element of Scrum involves regularly inspecting artifacts to detect variances?
  • What action does a Scrum Master take to help remove obstacles for the Development Team?
  • What is the primary value of refactoring code?
  • What is the relationship between Scrum and technical practices?
  • Which of the following is the Development Team not responsible for?
  • What action should be taken if the Product Owner is unavailable?
  • Choose two responsibilities of a self-organizing Development Team.
  • What provides the Development Team with direction and goals during a Sprint?
  • What are two responsibilities of a Development Team?
  • What does the term "Technical Debt" represent?
  • What can a Development Team deliver at the end of a Sprint?
  • What is the fundamental purpose of a Sprint in Scrum?
  • What is the time-box for a Daily Scrum?
  • What is a downside of having multiple Development Teams working in the same codebase?
  • What does Code Coverage indicate?
  • What happens if a product isn't released after a Sprint?
  • What does the BurnDown Chart represent?
  • In Scrum, which of the following is a critical element for successful teamwork?
  • What defines an "ideal day" for a person on a Scrum Team?
  • Who should be present to review and adjust the Sprint work when a Development Team cannot finish the complete forecast?
  • What best describes the Product Owner's interaction with stakeholders?
  • What is critical for a Development Team to effectively collaborate with the Product Owner?
  • Who primarily determines how the work is performed during a Sprint?
  • Which of these may a Development Team deliver at the end of a Sprint?
  • What is true about Development Team members' roles within a Nexus Integration Team?
  • If a Development Team completes all tasks ahead of time, what should be their next step regarding the Product Backlog?
  • What should a Development Team do when having trouble delivering a working increment due to unclear requirements?
  • Which type of testing focuses on individual units of code?
  • During Sprint Planning, what is created to help guide the Development Team through the Sprint?
  • Which of the following is NOT part of the Scrum Team?
  • During a Sprint Retrospective, which topic might be discussed by the Scrum Team?
  • What is the primary value of refactoring code?
  • When should new work or further decomposition of work be added to the Sprint Backlog?
  • What is the primary consideration when defining when a Product Backlog item is complete?
  • How many Product Backlogs are there in a Nexus framework?
  • What is the release burndown?
  • Does the Product Owner ensure the team selects enough from the Product Backlog for a Sprint to satisfy stakeholders?
  • What activities should a Product Owner undertake between Sprint Reviews and Sprint Planning?
  • What is one reason for automating the software build process?
  • Who is responsible for the system architecture of a product in Scrum?
  • Which two activities are part of the Product Owner role according to Scrum?
  • How are architecture and infrastructure treated in Scrum?
  • What does it mean for a Development Team to be cross-functional?
  • What happens if the Development Team cannot complete its work by the end of a time-box?
  • What is included in the Sprint Backlog?
  • Which statement best describes the nature of the first Sprint in Scrum?
  • Who is chiefly responsible for managing the Product Backlog?
  • What activity typically takes place during the Daily Scrum?
  • Can a first Sprint start without a complete and exhaustive Product Backlog?
  • When multiple Scrum Teams work from the same Product Backlog, how should items be chosen?
  • Which is a benefit of Continuous Integration?
  • When does the second Sprint begin?
  • Which phrase best describes the relationship of the Product Owner and the Development Team?
  • Which characteristics are desirable in a unit test?
  • What tool is commonly used to visualize the work in progress within a Scrum Team?
  • What is test-first development?
  • What does self-organization enhance within a Development Team?
  • During a Sprint Retrospective, what is the Scrum Master's responsibility?
  • What is a recommended action when using burndown charts for visualization?
  • What aspect ensures the team remains focused on the goals set for the Sprint?
  • What is the true purpose of a Sprint in Scrum?
  • What is true about the roles of testers in a Scrum Development Team?
  • Which activities are involved in refining Product Backlog items?
  • If two Scrum Teams join an existing product development, what impact might this have on the original Scrum Team’s productivity?
  • Why is it important for a Product Owner to order Product Backlog items by value points?
  • What does the Scrum Guide suggest about self-organizing teams?
  • Is a Product Owner entitled to postpone the start of a new Sprint after the conclusion of a previous Sprint?
  • What is an important aspect of the relationship between the Scrum Master and the Development Team?
  • In a scenario with six Scrum Teams working on one product, what should you strive for as a Scrum Master?
  • Who must be present during Product Backlog refinement sessions?
  • What does the term Technical Debt refer to?
  • Which of the following is a benefit of self-organization within a Development Team?
  • When managing the Product Backlog, what assumption does a Product Owner hold?
  • What is the time-box duration of a Daily Scrum?
  • When can the Development Team participate in Product Backlog refinement?
  • What should the Development Team possess in terms of skills?
  • What is the role of the Scrum Master regarding the Daily Scrum time-box?
  • Which of the following best defines the Scrum Team?
  • In Scrum, whose responsibility is it to represent the stakeholders?
  • How does Test Driven Development promote good design?
  • What describes the purpose of a definition of "Done" in a Development Team?
  • Which of the following describes an architecture spike?
  • Who tracks the remaining work of the Sprint?
  • Which is an expected outcome of a successful Sprint?
  • What role does the Scrum Master play during the Daily Scrum?
  • What is a key way for a Product Owner to apply validated learning?
  • During a Sprint, what are two roles of the Scrum Master?
  • Which of the following is NOT an advantage of Test Driven Development?
  • Which activity is NOT part of a Sprint?
  • Which of the following are considered feedback loops in Scrum?
  • When the workload exceeds the Development Team's capacity during Sprint Planning, what should the team do?
  • Which role is responsible for prioritizing the work on the Sprint Backlog?
  • How should a group of 100 people ideally form Development Teams in Scrum?
  • In a Scrum Team, who primarily coordinates with stakeholders and ensures user needs are met?
  • When does the second Sprint commence?
  • What does a trend line in a release burndown chart indicate?
  • What is the primary purpose of the Daily Scrum?
  • Which of the following activities will occur to refine Product Backlog items?
  • What is one of the benefits of Continuous Integration?
  • What is the primary role of the Scrum Master in regards to the Development Team during a Sprint?
  • Which statement best describes Continuous Integration?
  • During a Sprint Retrospective, what is the Scrum Master's role?
  • How does feedback become part of the Scrum framework?
  • How does consistent timing for the Daily Scrum benefit the Development Team?
  • When is the architecture of a system typically decided in Scrum projects?
  • Which of the following best describes 'Increment' in Scrum?
  • Why is collaboration essential between the Development Team and the Product Owner?
  • What type of learning is described as 'validated learning'?
  • What is the purpose of the Nexus Integration Team?
  • What defines the Definition of Done in Scrum?
  • What is the main goal of the Product Owner in the context of Scrum?
  • In a Development Team with distributed members, what should the Scrum Master do for the Daily Scrum?
  • Which Scrum event is focused on continuous improvement?
  • Which of the following is NOT a timeboxed event in Scrum?
  • Does the Product Owner determine how many Product Backlog items the Development Team selects for a Sprint?
  • During a Sprint, who decides how to accomplish the work?
  • Which Scrum event focuses on identifying improvements for future Sprints?
  • How should a group of 100 people be divided into Development Teams according to Scrum theory?
  • What are two ways that the Product Owner leads the inspection process?
  • How should a Development Team deal with non-functional requirements?
  • Code coverage does not ensure that what specific areas are exercised?
  • What is one important aspect of the Sprint Review?
  • What is the main purpose of the Product Backlog?
  • Which type of test is NOT typically automated?
  • In Scrum, why is constant peer review important?
  • When multiple Development Teams are working on a single product, how should they define "done"?
  • Who owns the Sprint Backlog in a Scrum Team?
  • What can happen if a Development Team lacks a consistent definition of done?
  • What is the primary role of the Product Owner in the Scrum Team?
  • What should a Product Owner do if the Development Team finds they cannot complete everything in the Sprint?
  • What does a self-organizing Development Team choose?
  • How is management external to the Scrum Team involved in the Daily Scrum?
  • What should a Product Owner do with feedback received during a Sprint Review?
  • What does "test first development" mean?
  • What is a primary benefit of establishing naming standards for code?
  • When can Development Team members become the exclusive owner of a Sprint Backlog item?
  • Which two practices help ensure good application architecture in Scrum?
  • What is a critical feature of Scrum Teams?
  • Which of the following are recognized feedback loops in Scrum?
  • What are two primary ways a Scrum Master helps maintain the Development Team’s productivity?
  • What is the Product Owner accountable for in Scrum?
  • Who is responsible for clearly expressing Product Backlog Items?
  • What should you do when you find a bug in previously delivered functionality?
  • Who is ultimately responsible for the estimates of Product Backlog items?
  • What relationship does Scrum have to technical practices?
  • Can only technical writers create documentation during a Sprint?
  • Who is ideally responsible for repairing a Continuous Integration build that failed?
  • What is one of the main goals of a Sprint Review?
  • Which statement accurately reflects the accountability of the Development Team in Scrum?
  • Which statement about the Scrum process is accurate with regard to its flexibility?
  • When enhancing an existing product, which piece of documentation is LEAST useful for a Scrum Team?
  • What is a crucial aspect for maintaining the Sprint Backlog?
  • How can a Product Owner apply validated learning effectively?
  • What is the primary purpose of the first part of the Nexus Sprint Retrospective?
  • What aspect might code coverage fail to capture regarding test effectiveness?
  • How can an organization assess whether a product built through Scrum is successful?
  • What is the key focus of a Scrum Master in supporting the Development Team?
  • What is the primary purpose of a Sprint in Scrum?
  • How many types of automated tests are commonly recognized in software development?
  • When assessing value in Scrum, what is a key aspect for the Product Owner?
  • During the Sprint, the Scrum Master's role includes which actions?
  • When do Development Team members take ownership of a Sprint Backlog Item?
  • What should happen to the Product Backlog during the Sprint Review?
  • What pre-conditions must be fulfilled in order to allow Sprint Planning to begin?
  • Which two activities are part of the Product Owner role according to Scrum?
  • When does the Development Team participate in Product Backlog refinement?
  • How often should a Scrum team conduct Sprint Retrospectives?
  • The Increment reviewed at the Sprint Review must be usable for which purpose?
  • What are two actions a Development Team might take when facing difficulties in delivering a work increment?
  • What does the Scrum Team do during the Sprint Review?
  • When does a Development Team make adjustments to its engineering practices?
  • Who is required to attend the Daily Scrum?
  • What does the Scrum Master primarily facilitate?
  • During Sprint Planning, if the team finds the selected items exceed their capacity, they should:
  • Which of the following best describes the role of the Product Owner in relation to the Development Team?
  • When is new work or decomposition of work added to the Sprint backlog?
  • What is the most effective way a Scrum Master can enhance the productivity of a Development Team?
  • Which statement best describes the focus of the Sprint Planning Meeting?
  • Which statement accurately describes the Product Backlog?
  • What is a primary benefit of Test Driven Development?
  • Which topic is NOT appropriate for discussion in a Sprint Retrospective?
  • How often does the length of a Daily Scrum change based on the Sprint length?
  • Who refines Product Backlog items?
  • How often should the build be executed in a Scrum framework?
  • What are two typical activities for a Product Owner during a Sprint?
  • What role does the Product Owner play in the inspection process during the Sprint Review?
  • What is the outcome of the Sprint Review event?
  • When the Development Team finds the Sprint workload too high, what is a valid action they can take?
  • What does a shared understanding of the definition of "Done" promote within a Scrum Team?
Subscribe